
A well-prepared enquiry makes it easier to understand what is required and what still needs clarification. You do not need every decision to be final, but it helps to separate confirmed information from assumptions and open questions.
01 — Set the project context
Start with a short description of the application and the stage of the project. A request for an initial review may need different information from a final procurement schedule.
- Include a project reference, company name and site location if available.
- State whether the request is for planning, technical review or procurement.
- Describe your required programme as a request, with dates to be confirmed.
02 — Make the product list easy to review
Use one entry for each product type or size. Consistent units and identifiable drawing references make a schedule easier to check and reduce avoidable follow-up questions.
- List the product name, material, dimensions, quantity and unit for each item.
- Include required finishes, accessories or connection details when specified.
- Label unknown values as “to be confirmed” instead of estimating silently.
03 — Keep the supporting documents aligned
Use the same revision references across drawings, specifications and schedules. If documents disagree, highlight the difference for the project team to resolve.
- Note drawing numbers, revision dates and relevant specification sections.
- Identify required data sheets, approvals or other project submissions.
- Attach supporting files when sharing the enquiry through email or WhatsApp; this website prepares the text.


